Drainage
In accordance with the Decree of the Head of the Moscow Region Administration of July 1, 1996 N 298-PG "On enactment of the section of the TSN "Norms of water consumption by the population of the Moscow region" the water consumption norms are taken as follows:
11 l/day per employee;
23 l/d per worker;
450 l/day for 1 shower set.
Water supply scheme
From the projected water intake points (WHP), located in the planned territory. Placing of VZU is made according to the conclusion of FSUE "Geotsentr-Moskva" and should be agreed with Rospotrebnadzor.
WZU in the industrial park will include:
artesian wells (working and one reserve);
fire-fighting water tanks (2 pcs. 700 cubic meters);
household-potable water reserve tanks (located inside the pumping station equipped with water absorbing filters;
pumping station of the second lift, combined with a water treatment station.
The water supply of the industrial park facilities is provided by one scheme of domestic, drinking and firefighting water supply (B1). At the next stages of the design of the estimated water consumption for water supply of the industrial park will be specified, in connection with what may be accepted the scheme of separate domestic and drinking and firefighting water supply.
Газоснабжение
Электроснабжение
Теплоснабжение
Section "Heat supply" is developed on the basis of the architectural and planning solution and the economic part of the project.
Heat consumption is determined in accordance with the "Guidelines for determining the cost of fuel, electricity and water for heat production by boiler plants of municipal heat and power enterprises (4th edition) of K.D. Pamfilov Academy of Municipal Services and similar projects.
Climatic conditions:
The design temperature of the outside air for heating - minus 27 °С;
The average temperature of the heating period - minus 3,4 °С;
duration of the heating period - 212 days.
Heat supply scheme
Buildings heat supply is provided from the projected autonomous heat sources of different capacities attached to the planned buildings. As the main fuel it is foreseen to use natural gas, and as a reserve light oil or liquefied hydrocarbon gases (LHCG). The heating of the public and business buildings located near the entrance groups, buildings of innovative and technological purpose, built-in and attached premises of administrative and public buildings of the pipe plant is provided from the planned energy center (modular gas piston heat power plant).
Heating of premises with low heat consumption and remote from the main building (checkpoint, etc.) is carried out by electric heaters.
Водоотведение
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040201:227
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363
Земельный участок 50:30:0040115:363