Egorievsk Industrial Park

Yegoryevsk Industrial Park
Convenient location of the industrial park
Industrial park of the "greenfield" category is located in the South-East of the Moscow region in the urban district of Egoryevsk. Population within a radius of 50 km from the urban district of Egoryevsk, including neighboring regions (Voskresensk, Kolomna, Shatura, Orekhovo-Zuyevo, etc.) - more than 500 thousand people.
  • Distance to Moscow - 85 km
  • Zhukovsky Airport - 60 km
  • Domodedovo Airport - 70 km
  • Distance to M5 highway - 35 km
  • Distance to M7 highway - 50 km
50 000 ₽
base price per sotka on the territory
8 000 ₽
per 1 KW - electricity connection
13 600 ₽
per cubic meter - connection to the gas supply

2 200 ₽
per cubic meter per day - connection to water supply networks
2 200 ₽
per cubic meter per day - connection to wastewater networks
36 000 ₽
Gcal/hour - connection to heat supply networks
Construction of facilities
Organizing the construction of industrial and logistics facilities under the Investor - from assistance in drafting the terms of reference to the commissioning of the facility
Construction of facilities
Organizing the construction of industrial and logistics facilities under the Investor - from assistance in drafting the terms of reference to the commissioning of the facility
Design documentation
Design documentation
Services for the development, coordination and examination of project documentation, services of technical supervision of the course of construction work
Services for the development, coordination and examination of project documentation, services of technical supervision of the course of construction work
Implementation of the "one-stop-shop" principle
1
Investment Application
and investor questionnaire
3
Lease agreement
land plot
(resident, MC, "individual entrepreneur")
6
Construction
resident enterprise
(lease/sale)
2
Selection of the site
in the park
5
Business plan of realization
investment project
4
Investment agreement (investor, AIR JSC and MC IP)
Available capacity limits for the industrial park
Necessary engineering systems - communication with free capacities on electricity, gas, water and sewage are brought to the industrial park Egoryevsk. All communications are brought in the proper amount, taking into account the potential growth of the industrial park and the increase in the number of residents.
Electricity
Water supply
Drainage
Heat supply
Gas supply
Calculated electrical load
6 MW
Cold water supply rate
Wastewater disposal
Estimated heat consumption
Calculated gas consumption
200 cubic meters. / day
200 cubic meters. / day
6.39 Gcal / hour
Heat supply
Engineering support for the projected area
Architectural and planning organization of the territory
Lower sections
Upper sections
Detailed information about the territory of the industrial park
Rent or sale of ready-made boxes for storage or production with all communications (heating, water supply, sewerage, wastewater disposal), a substation for uninterrupted electricity, round the clock security and parking.
The largest enterprises in the urban district of Egoryevsk
Join the ranks of successful residents
ContactS